You are in: Home > Products > TONGS > PMB-300
TONGS: PMB-300

FOR HANDLING ROCKS AND IRREGULAR UNITARY STONES FOR BREACKWATER CONSTRUCTION

Esquema 02
EQUIPMENT NEEDED        
• 1 lifting cable.  
• 1 opening / closing cable.  
TECHNICAL INFORMATION        
• Robust structure in high strenght steel.  
• Complete load through maximum penetration force.  
• Ideal relation between capacity / dead weight.
• Design & fabrication according to standard FEM 1001/98 section I.    
   
• CE conformity.  
Esquema 01
Tabla datos
Related product
« back
 
Home - Clients access - Legal Notice - Privacy Policy - Contact - Configurator - Web map
Credeblug SL – C/ Juan XXIII, 9 – 20.730 – Azpeitia (Gipuzkoa) – (+34) 943 810 150 – blug@blug.es